TORONTO, ON / ACCESSWIRE / December 1, 2022 / Aclara Resources Inc. ("Aclara" or the "Company") (TSX:ARA) is pleased to announce an updated Mineral Resource Estimate ("Updated Mineral Resource Estimate" or "Updated MRE") for its Rare Earth Element ("REE") project, Penco Module ("Project"), located in the BioBio Region of Chile.
Following drilling campaigns carried out during 2021 and 2022, a total of 5,298 m from 175 new drill holes have been completed and incorporated into the Updated MRE. This work has resulted in both the definition of a new resource area, Alexandra Poniente, as well as an increase in the Mineral Resources within the Project area.
Aclara is planning to incorporate these results into a Feasibility Study for the Project, to be developed during 2023.
The exploration and infill drilling program resulted in:
A comparison of the Updated Mineral Resource Estimate and the mineral resource estimate presented in the "Amended and Restated NI 43-101 Technical Report - Preliminary Economic Assessment for Penco Module Project - Penco, Biobio Region, Chile" with an effective date of September 15, 2021, as prepared by Ausenco Chile Limitada and filed on December 2, 2021 (the "Technical Report") (which is available under the Company's profile on SEDAR at www.sedar.com) is presented in Table 1, and highlights an increase of 32.6% in Measured and Indicated Resources and a decrease of 19.3% in Inferred Mineral Resources. Drilling success at the Project was tempered by a higher cut-off value at the Project, reflecting changes to some input prices. The Updated MRE (October 13, 2022) is presented in Table 2 and the Previous MRE (September 15, 2021) is presented in Table 3.
Table 1: Updated Mineral Resource Estimate Comparison to Previous Mineral Resource Estimate
Category | MRE (Sept 15, 2021) | MRE (Oct 13, 2022) | Variation | |||||
Tonnage | Contained TREO | Tonnage | Contained TREO | Tonnage | Contained TREO | |||
(Mt) | (kt) | (Mt) | (kt) | (Mt) | (%) | (kt) | (%) | |
Measured | 15.4 | 37.9 | 21.3 | 49.3 | 5.9 | 38.2% | 11.4 | 30.0% |
Indicated | 5.3 | 12.3 | 6.2 | 13.7 | 0.9 | 16.5% | 1.4 | 11.1% |
Measured + Indicated | 20.7 | 50.2 | 27.5 | 62.9 | 6.8 | 32.6% | 12.7 | 25.3% |
Inferred | 2.1 | 4.8 | 1.7 | 3.4 | -0.4 | -19.3% | -1.4 | -29.5% |
Notes:
Table 2: Updated Mineral Resource Estimate (Effective October 13, 2022)
Category | Tonnage | NSR | TREO | TREY | TREY | TDYTB | TNDPR | TDY | TND |
(Mt) | (US$/t) | (ppm) | (ppm) | Recovery | (ppm) | (ppm) | Recovery | Recovery | |
Measured | 21.3 | 28.4 | 2,315 | 1,952 | 22.83% | 67 | 384 | 43.15% | 19.57% |
Indicated | 6.2 | 27.4 | 2,212 | 1,865 | 22.80% | 64 | 368 | 43.49% | 19.38% |
Measured + | 27.5 | 28.2 | 2,292 | 1,932 | 22.82% | 66 | 380 | 43.23% | 19.53% |
Inferred | 1.7 | 24.3 | 1,999 | 1,679 | 22.56% | 71 | 298 | 39.25% | 18.06% |
Table 3: Previous Mineral Resource Estimate (Effective September 15, 2021)
Category | Tonnage | NSR | TREO | TREY | TREY | TDYTB | TNDPR | TDY | TND |
(Mt) | (US$/t) | (ppm) | (ppm) | Recovery | (ppm) | (ppm) | Recovery | Recovery | |
Measured | 15.4 | 27.8 | 2,467 | 2,080 | 17.99% | 71 | 401 | 35.70% | 15.32% |
Indicated | 5.3 | 24.5 | 2,309 | 1,945 | 16.67% | 69 | 373 | 33.30% | 13.36% |
Measured + | 20.7 | 27.0 | 2,426 | 2,045 | 17.65% | 71 | 394 | 35.08% | 14.82% |
Inferred | 2.1 | 24.0 | 2,299 | 1,936 | 16.37% | 70 | 371 | 32.49% | 12.72% |
Notes:
The Updated MRE encompasses four mineralized zones, namely Luna, Maite, Victoria (Victoria Norte and Victoria Sur) and Alexandra (Alexandra Oriente and Alexandra Poniente). The Updated MRE figures by zone are presented in Table 4 and grade values for all 15 elements are shown in Table 5.
Updated Mineral Resource Estimate Details
Figure 1 highlights the location of the new drill holes, the Mineral Resource pit shells, and the environmental buffers limiting the Mineral Resources. New drilling incorporated into the Updated MRE was completed between May 2021 to May 2022.
Figure 1: Location of New Drilling, Constraining Pit Shells, Environmental Constraints, and Project Boundary
Several restricted areas exist within the Project area viz. native forests, the Penco Creek, the Ruta del Itata highway servitude, and the Alexandra Creek. The Updated MRE does not include any mineralized material within these areas.
A geological overview for the Project is available the Technical Report under the Company's profile on SEDAR at www.sedar.com. The geology, sampling, assay protocols, and QA/QC for the Alexandra Poniente zone have been presented in Aclara's news release on brownfield exploration results, dated July 25, 2022, which is also available on SEDAR, stating that the total grades database shows good precision and accuracy, and all estimating protocols are in line with standard industry practices.
Estimation Methodology
High-grade capping supported by statistical analyses (Parrish criteria) were completed on raw assay data before compositing and applying to the Victoria, Alexandra, and Luna zones. No capping was applied to Maite samples, as the statistical analysis suggested.
The Updated MRE was completed using GEOVIA Surpac for four different block models (Luna, Maite, Victoria, Alexandra zones) each consisting of 10 m x 10 m x 2 m blocks. Grade interpolation for each of the 15 elements was obtained by Ordinary Kriging using hard boundaries.
Variography was done for each of the four domains in the four different zones, for three groups of elements: Heavy Rare Earth elements plus Yttrium (Gd, Tb, Dy, Ho, Er, Tm, Yb, Lu, Y), Light Rare Earth elements minus Europium (La, Ce, Pr, Nd, Sm), and Europium (Eu) which showed a poor correlation with the other two groups. Block estimation was validated visually, by global bias analysis and by trend analysis. Figure 2 shows a comparison between estimated blocks and composites for a vertical section at the Alexandra Poniente zone. Additionally, a Whittle pit outline is displayed in the section.
Figure 2: Comparison Between Estimated Blocks and Composites for a Vertical Section at Alejandra Poniente
Average bulk density values ranging from 1.25 to 2.0 t/m3 were assigned to each Geological Unit. In-situ trench tests were completed at surface (horizon A) and for the deeper horizons (horizons B, C, and D0), and density was calculated using Shelby tubes.
The Updated MRE is classified as Measured, Indicated, and Inferred Mineral Resources, respectively. For both Measured and Indicated Mineral Resources, the Kriging estimation error must be less than 15% in 90% of the cases, for a volume equivalent to three months of production for Measured and one year for Indicated.
The Measured Mineral Resource category is defined by three or more drill holes when the closest sample is located less than 40 m from the block being estimated, or with two drill holes if the closest sample is located less than of 24 m from the block being estimated.
The Indicated Mineral Resource category is defined with a minimum of two drill holes when the closest sample is be less than 65 m from the block being estimated.
The Inferred Mineral Resource category is defined with all blocks estimated with samples closer than 160 m.
Figure 3 presents a plan view of the Alejandra block model displaying the three block categories.
The Updated MRE is pit-constrained using GEOVIA Whittle 2022 software, with an overall slope angle of 23° and a mining cost of US$3/t. The Updated MRE is reported at a Net Smelter Return (NSR) marginal cut-off of US$13/t based on processing plus general and administrative cost estimates.
NSR was calculated for each block using the following parameters:
The Technical Report provides the basis for the assumptions used in the Updated MRE, unless otherwise stated. All technical and economic parameters will be subject to further consideration during the preparation of the Feasibility Study, which is expected to be developed during 2023.
Neither the authors of this news release nor the management of Aclara are aware of any environmental, permitting, legal, title-related, taxation, socio-political, marketing, or any other relevant issue not reported in the Technical Report that could materially affect the Updated MRE other than the information included in Aclara's news release, dated May 10, 2022, which is also available on SEDAR, where the Company provided an update on its corporate strategy.
Qualified Persons and Review of Technical Information
The Updated MRE has been prepared by Andres Beluzan (General Manager, ABelco Consulting SpA), an independent consultant for geostatistics and resource estimation with more than 12 years of relevant experience. Mr. Beluzan, who is responsible for the Updated MRE, and has reviewed and approved the scientific and technical information related to the Updated MRE contained in this news release, is registered under the Chilean Mining Commission and is an independent Qualified Person under NI 43-101.
The scientific and technical information related to geology, drilling, mineralization, and geological modeling in this news release has been reviewed and approved by Luis Oviedo (General Manager, Atticus Chile S.A.), an independent Consulting Geologist with more than 45 years' experience. Mr. Oviedo is a member of the Colegio de Geólogos de Chile and the Institute of Mining Engineers of Chile, is registered under the Chilean Mining Commission and is an independent Qualified Person under NI 43-101.
Manuel Arre (Head of Mine Engineering, Aclara), a mining engineer with 20 years' experience in economic modeling of mining projects, has produced pit shells to constrain the resources for reasonable prospects of eventual economic extraction. Mr. Arre is registered under the Chilean Mining Commission and is a Qualified Person under NI 43-101. He has led an internal peer review for the Updated MRE.
About Aclara
Aclara Resources is a Rare Earths company with a development project in Chile, and is listed on the TSX (TSX:ARA).
Aclara is initiating the development of its resources through a project called the Penco Module, which covers a surface area of approximately 600 hectares, and which hosts ionic clays rich in rare earth elements. Aclara is currently focused on the development and future construction and operation of the Penco Module, which will aim to produce a rare earth concentrate through a processing plant that will be fed by clays from nearby deposits. Aclara's extraction process offers several environmentally positive attributes such as: no blasting, crushing, or milling; no tailings facility; minimal water consumption due to a high level of water recirculation; is amenable to leaching with a fertilizer; and contains no radioactivity.
Contact Information
For further information, please visit www.aclara-re.com or contact: This email address is being protected from spambots. You need JavaScript enabled to view it. or This email address is being protected from spambots. You need JavaScript enabled to view it.
Forward-Looking Statements
This news release contains "forward-looking information" within the meaning of applicable securities legislation, which reflects the Company's current expectations regarding future events, including statements with regard to mineral continuity, grade and upside at the Alexandra Poniente zone and the Company's expectations in respect thereof, the Updated MRE in respect of the Project and the estimates contained therein, the Company's proposed Feasibility Study and the Expected timing and contents in respect thereof., Forward-looking information is based on a number of assumptions and is subject to a number of risks and uncertainties, many of which are beyond the Company's control. Such risks and uncertainties include, but are not limited to, the factors discussed under "Risk Factors" in the Company's annual information form dated as of March 30, 2022, filed on the Company's SEDAR profile. Actual results and timing could differ materially from those projected herein. Unless otherwise noted or the context otherwise indicates, the forward- looking information contained in this news release is provided as of the date of this news release and the Company does not undertake any obligation to update such forward-looking information, whether because of new information, future events or otherwise, except as expressly required under applicable securities laws.
Table 4: Updated Mineral Resource Estimate (Effective October 13, 2022), Detail by Zone
Zone | Category | Tonnage | NSR | TREO | TREY | TREY | TDYTB | TNDPR | TDY | TND |
(Mt) | (US$/t) | (ppm) | (ppm) | Recovery | (ppm) | (ppm) | Recovery | Recovery | ||
Alexandra O. | Measured | 4.01 | 27.8 | 2429 | 2044 | 20.09% | 78 | 383 | 41.88% | 10.16% |
Indicated | 1.11 | 25.5 | 2316 | 1951 | 18.96% | 71 | 375 | 41.66% | 10.07% | |
M + I | 5.12 | 27.3 | 2,404 | 2,024 | 19.84% | 76 | 381 | 41.83% | 10.14% | |
Inferred | 0.22 | 23.0 | 2,175 | 1,832 | 18.27% | 69 | 351 | 39.89% | 9.37% | |
Alexandra P. | Measured | 4.11 | 27.8 | 2065 | 1745 | 23.58% | 54 | 358 | 46.95% | 24.08% |
Indicated | 1.09 | 27.8 | 1911 | 1613 | 26.03% | 52 | 331 | 49.40% | 27.53% | |
M + I | 5.21 | 27.8 | 2,033 | 1,717 | 24.09% | 53 | 352 | 47.47% | 24.80% | |
Inferred | 0.38 | 22.8 | 1,420 | 1,199 | 28.21% | 38 | 247 | 53.02% | 32.48% | |
Luna | Measured | 1.68 | 25.1 | 1545 | 1295 | 29.27% | 66 | 211 | 42.38% | 20.20% |
Indicated | 0.47 | 24.8 | 1417 | 1185 | 33.87% | 64 | 184 | 44.24% | 23.60% | |
M + I | 2.15 | 25.1 | 1,517 | 1,270 | 30.28% | 66 | 205 | 42.79% | 20.95% | |
Inferred | 0.60 | 27.5 | 2,077 | 1,734 | 25.55% | 99 | 249 | 33.44% | 15.15% | |
Maite | Measured | 3.93 | 30.5 | 2501 | 2110 | 21.25% | 71 | 421 | 41.43% | 16.93% |
Indicated | 1.59 | 30.8 | 2510 | 2117 | 21.47% | 72 | 422 | 41.47% | 16.91% | |
M + I | 5.52 | 30.6 | 2,504 | 2,112 | 21.32% | 71 | 421 | 41.44% | 16.92% | |
Inferred | 0.02 | 35.3 | 2,893 | 2,439 | 21.78% | 82 | 481 | 41.50% | 16.90% | |
Victoria N. | Measured | 5.73 | 30.6 | 2695 | 2274 | 23.53% | 70 | 457 | 42.01% | 23.81% |
Indicated | 0.87 | 29.3 | 2566 | 2166 | 23.98% | 64 | 439 | 43.54% | 25.07% | |
M + I | 6.60 | 30.4 | 2,678 | 2,259 | 23.59% | 69 | 455 | 42.22% | 23.98% | |
Inferred | 0.14 | 20.4 | 2,364 | 1,993 | 17.30% | 65 | 379 | 31.20% | 18.32% | |
Victoria S. | Measured | 1.81 | 22.8 | 1741 | 1468 | 22.51% | 54 | 292 | 45.40% | 21.94% |
Indicated | 1.04 | 23.6 | 2027 | 1710 | 19.46% | 59 | 341 | 41.91% | 17.78% | |
M + I | 2.86 | 23.1 | 1,845 | 1,557 | 21.40% | 56 | 310 | 44.13% | 20.42% | |
Inferred | 0.34 | 22.2 | 2,195 | 1,852 | 15.88% | 62 | 364 | 36.81% | 12.65% |
Notes:
Table 5: Updated Mineral Resource Estimate (Effective October 13, 2022), Detail by REE
Category | Tonnage | TLA | TCE | TPR | TND | TSM | TEU | TGD | TTB | TDY | THO | TER | TTM | TYB | TLU | TY |
(Mt) | (ppm) | (ppm) | (ppm) | (ppm) | (ppm) | (ppm) | (ppm) | (ppm) | (ppm) | (ppm) | (ppm) | (ppm) | (ppm) | (ppm) | (ppm) | |
Measured | 21.3 | 321 | 658 | 79 | 305 | 51 | 3 | 49 | 8 | 58 | 12 | 36 | 5 | 33 | 5 | 330 |
Indicated | 6.2 | 308 | 626 | 75 | 293 | 49 | 3 | 48 | 8 | 56 | 12 | 34 | 5 | 31 | 4 | 315 |
M + I | 27.5 | 318 | 650 | 78 | 302 | 50 | 3 | 49 | 8 | 58 | 12 | 36 | 5 | 32 | 5 | 326 |
Inferred | 1.7 | 249 | 510 | 61 | 237 | 41 | 2 | 46 | 9 | 63 | 14 | 40 | 6 | 36 | 5 | 363 |
Notes:
Table 6: Metallurgical Recoveries (%) used for NSR Calculation
Zone | Unit | R. Ce | R. La | R. Pr | R. Nd | R. Sm | R. Y | R. Eu | R. Gd | R. Tb | R. Dy | R. Ho | R. Er | R. Tm | R. Yb | R. Lu |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
A. Oriente | GG_B | 1.7 | 6.3 | 7.7 | 8.6 | 12.1 | 49.9 | 33.5 | 25.2 | 31.9 | 37.0 | 36.6 | 39.1 | 39.0 | 37.7 | 37.0 |
GG_C | 1.1 | 5.1 | 6.1 | 7.1 | 9.8 | 49.7 | 40.5 | 21.6 | 29.6 | 33.7 | 36.2 | 38.5 | 40.6 | 38.5 | 38.3 | |
DRT_B | 3.5 | 9.8 | 15.9 | 18.8 | 32.8 | 89.3 | 45.0 | 57.2 | 60.7 | 67.6 | 69.1 | 68.6 | 76.3 | 69.5 | 65.9 | |
DRT_C | 0.9 | 1.0 | 1.5 | 2.3 | 4.8 | 17.5 | 9.1 | 8.0 | 10.2 | 12.2 | 14.0 | 14.6 | 13.6 | 13.8 | 13.0 | |
MP_B | 2.3 | 4.5 | 6.2 | 7.4 | 8.9 | 12.8 | 24.5 | 10.7 | 12.1 | 12.4 | 12.6 | 12.3 | 13.4 | 12.5 | 12.8 | |
MP_C | 2.2 | 4.7 | 9.5 | 13.2 | 17.6 | 15.1 | 30.3 | 15.1 | 17.9 | 17.5 | 13.1 | 12.6 | 12.0 | 11.4 | 11.5 | |
A. Poniente | GG_B | 1.8 | 16.0 | 18.9 | 20.6 | 23.3 | 68.8 | 46.3 | 34.0 | 41.6 | 44.5 | 49.4 | 52.5 | 45.7 | 48.7 | 51.3 |
GG_C | 1.5 | 5.6 | 6.8 | 7.7 | 9.8 | 39.4 | 126.0 | 16.0 | 22.9 | 23.8 | 25.8 | 25.3 | 24.5 | 22.6 | 26.0 | |
DRT_B | 4.4 | 26.7 | 34.2 | 36.9 | 41.0 | 65.0 | 57.0 | 55.0 | 58.3 | 56.3 | 60.9 | 57.7 | 55.1 | 55.4 | 53.8 | |
DRT_C | 1.3 | 1.6 | 2.9 | 4.6 | 9.0 | 24.2 | 11.5 | 12.4 | 14.6 | 16.5 | 19.3 | 20.2 | 18.9 | 20.2 | 20.7 | |
MP_B | 4.8 | 16.0 | 18.6 | 20.0 | 79.5 | 8.3 | 21.6 | 12.9 | 12.2 | 10.0 | 9.3 | 8.4 | 6.7 | 7.5 | 7.8 | |
MP_C | 4.8 | 16.0 | 24.1 | 24.5 | 26.3 | 70.0 | 39.2 | 38.6 | 33.3 | 46.8 | 40.6 | 42.9 | 40.7 | 43.2 | 39.7 | |
Luna | GG_B | 1.5 | 9.1 | 11.9 | 13.8 | 20.9 | 55.3 | 31.8 | 33.0 | 39.3 | 36.4 | 45.8 | 42.0 | 43.7 | 38.9 | 40.2 |
GG_C | 2.2 | 5.4 | 8.2 | 10.3 | 12.2 | 39.9 | 25.1 | 23.1 | 24.5 | 25.1 | 28.6 | 28.3 | 26.5 | 23.6 | 22.9 | |
DRT_B | 3.6 | 24.8 | 28.9 | 32.7 | 33.4 | 82.8 | 47.6 | 47.0 | 52.7 | 52.7 | 59.3 | 57.2 | 59.8 | 51.0 | 48.9 | |
DRT_C | 4.6 | 7.1 | 6.7 | 7.4 | 12.7 | 20.5 | 24.8 | 14.6 | 17.6 | 17.3 | 17.4 | 17.1 | 15.5 | 12.4 | 13.5 | |
MP_B | 3.0 | 23.1 | 26.0 | 28.8 | 34.6 | 60.8 | 42.5 | 37.4 | 55.5 | 61.5 | 58.1 | 57.2 | 67.0 | 58.0 | 58.5 | |
MP_C | 2.5 | 3.1 | 4.3 | 5.2 | 7.5 | 8.8 | 25.1 | 7.2 | 9.3 | 9.5 | 8.7 | 7.6 | 6.9 | 6.3 | 6.8 | |
Maite | GG_B | 2.2 | 10.6 | 16.0 | 16.9 | 16.6 | 66.2 | 24.8 | 30.3 | 36.1 | 41.5 | 48.3 | 49.5 | 50.4 | 48.4 | 49.1 |
GG_C | 0.8 | 3.8 | 3.1 | 3.4 | 4.2 | 16.2 | 11.4 | 7.6 | 8.4 | 10.1 | 12.4 | 12.0 | 11.6 | 10.3 | 10.2 | |
DRT_B | 0.2 | 0.3 | 1.4 | 0.9 | 4.5 | 24.3 | 3.0 | 7.2 | 14.3 | 14.1 | 13.1 | 15.7 | 23.9 | 13.3 | 22.0 | |
DRT_C | 1.0 | 3.5 | 5.1 | 6.4 | 7.4 | 23.4 | 15.3 | 14.5 | 14.2 | 17.3 | 17.9 | 20.0 | 24.9 | 15.8 | 22.0 | |
MP_B | 4.6 | 12.3 | 16.3 | 21.4 | 27.6 | 35.5 | 40.1 | 26.1 | 29.4 | 30.1 | 34.5 | 33.3 | 32.6 | 31.7 | 31.1 | |
MP_C | 1.5 | 3.7 | 4.9 | 7.3 | 12.2 | 41.8 | 35.3 | 19.2 | 27.6 | 30.6 | 31.3 | 33.7 | 31.5 | 29.2 | 26.1 | |
V. Norte | GG_B | 1.6 | 18.7 | 18.6 | 20.4 | 21.7 | 62.8 | 37.2 | 34.9 | 36.4 | 40.3 | 46.7 | 45.8 | 46.0 | 40.9 | 40.8 |
GG_C | 2.4 | 8.5 | 9.7 | 11.5 | 10.9 | 26.0 | 18.1 | 18.9 | 20.1 | 21.1 | 21.4 | 21.5 | 21.5 | 18.5 | 21.7 | |
DRT_B | 6.9 | 35.5 | 46.6 | 51.5 | 62.9 | 93.3 | 59.9 | 62.5 | 78.8 | 74.6 | 77.4 | 77.6 | 79.3 | 91.6 | 70.9 | |
DRT_C | 2.5 | 4.4 | 4.6 | 5.4 | 6.6 | 14.8 | 13.4 | 8.1 | 9.2 | 9.9 | 11.5 | 11.1 | 10.1 | 9.7 | 10.4 | |
MP_B | 5.2 | 36.0 | 37.8 | 44.1 | 55.1 | 69.4 | 37.8 | 53.5 | 53.5 | 54.9 | 54.5 | 53.9 | 52.6 | 58.5 | 53.7 | |
MP_C | 1.7 | 1.9 | 2.5 | 3.3 | 4.4 | 14.0 | 7.2 | 5.9 | 8.5 | 10.4 | 10.5 | 10.5 | 7.9 | 6.9 | 5.8 | |
V. Sur | GG_B | 2.7 | 10.7 | 12.3 | 14.6 | 17.2 | 45.7 | 45.5 | 31.9 | 37.7 | 40.2 | 41.9 | 46.7 | 50.1 | 46.7 | 45.4 |
GG_C | 0.9 | 1.7 | 2.4 | 2.9 | 5.6 | 27.6 | 19.3 | 15.7 | 20.5 | 26.2 | 28.9 | 23.6 | 25.6 | 22.1 | 26.9 | |
DRT_B | 3.3 | 11.3 | 14.6 | 16.6 | 20.9 | 81.5 | 36.9 | 47.2 | 49.0 | 53.7 | 59.6 | 54.2 | 55.2 | 62.9 | 61.8 | |
DRT_C | 0.8 | 0.9 | 1.1 | 1.5 | 2.6 | 11.2 | 6.2 | 3.9 | 5.3 | 6.3 | 7.5 | 8.7 | 8.0 | 7.6 | 7.3 | |
MP_B | 5.6 | 36.0 | 40.5 | 46.6 | 39.1 | 63.4 | 75.9 | 56.5 | 49.4 | 59.7 | 59.2 | 60.7 | 64.3 | 57.1 | 55.3 | |
MP_C | 3.1 | 7.9 | 8.0 | 8.1 | 12.2 | 56.3 | 32.1 | 17.0 | 21.8 | 24.6 | 28.1 | 30.5 | 26.9 | 27.2 | 23.8 |
Notes:
Last Trade: | C$0.43 |
Daily Change: | 0.01 2.38 |
Daily Volume: | 77,593 |
Market Cap: | C$71.560M |
November 21, 2024 September 18, 2024 September 05, 2024 August 19, 2024 |
UGE International develops, owns, and operates commercial and community solar projects in the United States and strategic markets abroad. Our distributed energy solutions deliver cheaper, cleaner energy to businesses and consumers...
CLICK TO LEARN MORENorthstar Clean Technologies is a cleantech company focused on the sustainable recovery and reprocessing of asphalt shingles. Northstar’s mission is to be the leader in the recovery and reprocessing of asphalt shingles in North America...
CLICK TO LEARN MORECOPYRIGHT ©2022 GREEN STOCK NEWS