Standard Uranium Ltd. (“Standard Uranium” or the “Company”) (TSX-V: STND) (OTCQB: STTDF) (Frankfurt: FWB:9SU) is pleased to announce its exploration schedule for 2023, to continue advancing its uranium projects in the Athabasca Basin (the “Basin”), Saskatchewan, Canada towards discovery.
The Company holds five projects located across the highly prolific Basin, which hosts the world’s highest grade uranium deposits. The Company will be following up on prospective drilling results from 2022 on its flagship Davidson River Project (“Davidson River”) in the southwestern corner of the Basin and its 100% owned Sun Dog Project (“Sun Dog”) near Uranium City, Saskatchewan. In addition, the Company has planned inaugural drill programs over two of its three 100% owned projects in the eastern side of the Basin, which are drill ready following successful geophysical surveys that were completed throughout 2022.
Jon Bey, CEO and Chairman of the Company, stated: “2023 will be the Company’s most comprehensive and exciting exploration season to date. We strongly believe the uranium market will be one of the few bright spots in the investment landscape and we are planning to apply a modern approach to historical data and deploy more advanced analysis techniques in the upcoming drill campaigns. We have our projects ready for drilling with our First Nations agreements in place, drill permits in hand, and our vendors contracted. We recently completed a capital raise of $4.2 million and we will prioritize our exploration work starting with our Sun Dog drill program this winter.”
2023 Exploration Summary
Sun Dog Project
Davidson River Project
Eastern Basin Projects – Atlantic, Canary, Ascent
Figure 1. Timeline of Standard Uranium’s 2023 exploration plans
Permitting and First Nations and Metis Engagement
Sean Hillacre, VP Exploration, commented: “The technical team and I are very enthusiastic for the upcoming year of exploration in 2023, which is poised to be our most exciting to date. On all our projects, integration of prospective exploration results from our current work in concert with GoldSpot’s fresh interpretations provides us with exceptional targets to explore for high-grade uranium deposits during our 2023 drill programs.”
Neil McCallum, Lead Technical Director, stated: “2023 is expected to be a very active year for Standard Uranium, with several opportunities to make a new discovery in the Basin. We have combined the innovative talents of consultants such as GoldSpot with the industry-leading drilling contractors to maximize our chances for success.”
Figure 2. Plan map of Sun Dog highlighting historical drill holes, geophysical conductors, and high-priority target areas.
Figure 3. Plan map showing summer 2022 drill holes at Davidson River, and kilometres of untested conductor strike length.
Figure 4. Plan map highlighting Standard Uranium’s eastern Athabasca Projects and exploration trends, with respect to current uranium showings, discoveries, and deposits.
The scientific and technical information contained in this news release, including the sampling, analytical and test data underlying the technical information contained in this news release, has been reviewed, verified, and approved by Sean Hillacre, P.Geo., VP Exploration of the Company and a “qualified person” as defined in NI 43-101.
About Standard Uranium (TSX-V: STND)
We find the fuel to power a clean energy future
Standard Uranium is a uranium exploration company with a focus on the world-class Athabasca Basin in Saskatchewan, Canada. Since its establishment, Standard Uranium has focused on the identification and exploration of Athabasca-style uranium targets with a view to discovery and future development.
Standard Uranium’s Davidson River Project, in the southwest part of the Athabasca Basin, Saskatchewan, comprises seven mineral claims over 20,006 hectares. Davidson River is highly prospective for basement-hosted uranium deposits due to its location along trend from recent high-grade uranium discoveries. However, owing to the large project size with multiple targets, it remains broadly under-tested by drilling. Recent intersections of wide, structurally deformed and strongly altered shear zones support provide significant confidence in the exploration model and future success is expected.
Standard Uranium's Sun Dog project, in the northwest part of the Athabasca Basin, Saskatchewan, is comprised of six mineral claims over 17,309 hectares. The Sun Dog project is highly prospective for basement and unconformity hosted uranium deposits, yet remains largely untested by sufficient drilling despite its location proximal to uranium discoveries in the area.
For further information contact:
Jon Bey, Chief Executive Officer, and Chairman
550 Denman Street, Suite 200
Vancouver, BC V6G 3H1
Tel: 1 (306) 850-6699
E-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.
Cautionary Statement Regarding Forward-Looking Statements
This news release contains “forward-looking statements” or “forward-looking information” (collectively, “forward-looking statements”) within the meaning of applicable securities legislation. All statements, other than statements of historical fact, are forward-looking statements and are based on expectations, estimates and projections as of the date of this news release. Forward-looking statements include, but are not limited to, statements regarding: the timing and content of upcoming work programs; geological interpretations; timing of the Company’s exploration programs; and estimates of market conditions.
Forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those expressed or implied by forward-looking statements contained herein. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Certain important factors that could cause actual results, performance or achievements to differ materially from those in the forward-looking statements are highlighted in the “Risk and Uncertainties” in the Company’s management discussion and analysis for the fiscal year ended April 30, 2022, dated August 26, 2022.
Forward-looking statements are based upon a number of estimates and assumptions that, while considered reasonable by the Company at this time, are inherently subject to significant business, economic and competitive uncertainties and contingencies that may cause the Company’s actual financial results, performance, or achievements to be materially different from those expressed or implied herein. Some of the material factors or assumptions used to develop forward-looking statements include, without limitation: the future price of uranium; anticipated costs and the Company’s ability to raise additional capital if and when necessary; volatility in the market price of the Company’s securities; future sales of the Company’s securities; the Company’s ability to carry on exploration and development activities; the success of exploration, development and operations activities; the timing and results of drilling programs; the discovery of mineral resources on the Company’s mineral properties; the costs of operating and exploration expenditures; the presence of laws and regulations that may impose restrictions on mining; employee relations; relationships with and claims by local communities and indigenous populations; availability of increasing costs associated with mining inputs and labour; the speculative nature of mineral exploration and development (including the risks of obtaining necessary licenses, permits and approvals from government authorities); uncertainties related to title to mineral properties; assessments by taxation authorities; fluctuations in general macroeconomic conditions.
The forward-looking statements contained in this news release are expressly qualified by this cautionary statement. Any forward-looking statements and the assumptions made with respect thereto are made as of the date of this news release and, accordingly, are subject to change after such date. The Company disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or otherwise, except as may be required by applicable securities laws. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.
Neither the TSX-V nor its Regulation Services Provider (as that term is defined in the policies of the TSX-V) accepts responsibility for the adequacy or accuracy of this release.
Photos accompanying this announcement are available at:
Last Trade: | US$0.06 |
Daily Volume: | 0 |
Market Cap: | US$2.920M |
November 15, 2024 October 31, 2024 October 16, 2024 September 26, 2024 September 24, 2024 |
DevvStream provides upfront capital for sustainability projects in exchange for carbon credit rights. Through these rights, the company generates and manages carbon credits by utilizing the most technologically advanced...
CLICK TO LEARN MORELeveraging its vertically-integrated approach from mine to material manufacturing, Graphite One intends to produce high-grade anode material for the lithium-ion electric vehicle battery market and energy storage systems...
CLICK TO LEARN MORECOPYRIGHT ©2022 GREEN STOCK NEWS