VANCOUVER, British Columbia, March 02, 2023 (GLOBE NEWSWIRE) -- Lithium Americas Corp. (TSX: LAC) (NYSE: LAC) (“Lithium Americas” or the “Company”) is pleased to announce the commencement of construction at its 100%-owned Thacker Pass lithium project (“Thacker Pass” or the “Project”) in Humboldt County, Nevada, following the receipt of notice to proceed from the Bureau of Land Management (“BLM”).
“Starting construction is a momentous milestone for Thacker Pass and one we have been working towards for over a decade,” said Jonathan Evans, President and CEO. “We are excited about the prospect of generating economic growth in Northern Nevada and playing a major role in the domestic lithium supply chain for electric vehicles.”
Thacker Pass is targeting 80,000 tonnes per annum (“tpa”) of battery-quality lithium carbonate (“Li2CO3”) production capacity in two phases of 40,000 tpa, respectively (“Phase 1” and “Phase 2”). Phase 1 production is expected to commence in the second half of 2026. The Project is expected to create 1,000 jobs during construction and 500 jobs during operations. Further information can be found in the technical report titled “Feasibility Study, National Instrument 43-101 Technical Report for the Thacker Pass Project Humboldt County, Nevada, USA” with an effective date of November 2, 2022 (the “Technical Report”), filed on SEDAR under the Company’s profile on January 31, 2023.
CONSTRUCTION UPDATE:
Construction at Thacker Pass commenced following the favorable ruling from the US District Court, District of Nevada (“Federal Court”) for the issuance of the Record of Decision (“ROD”), where the Federal Court confirmed the permitting process for Thacker Pass was conducted thoroughly and responsibly. The Federal Court declined to vacate the ROD and ordered the BLM to consider one issue under the mining law relating to the area designated for waste storage and tailings and did not impose any restrictions expected to impact the construction timeline. The Company is working closely with the BLM to complete the required follow-up and does not expect it to impact the overall construction timeline.
ABOUT LITHIUM AMERICAS
Lithium Americas is focused on advancing lithium projects in Argentina and the United States to production. In Argentina, Caucharí-Olaroz is advancing towards first production and Pastos Grandes represents regional growth. In the U.S., Thacker Pass has commenced construction and is targeting first production in the second half of 2026. The Company trades on both the Toronto Stock Exchange and on the New York Stock Exchange, under the ticker symbol “LAC”.
For further information contact:
Investor Relations
Telephone: 778-656-5820
Email: This email address is being protected from spambots. You need JavaScript enabled to view it.
Website: www.lithiumamericas.com
FORWARD-LOOKING INFORMATION
This news release contains certain forward-looking information, including information with respect to construction at Thacker Pass and the timeline for expected production. Statements that are not historical fact are “forward-looking information” as that term is defined in National Instrument 51-102 of the Canadian Securities Administrators (collectively, “forward-looking information”). Forward-looking information is frequently, but not always, identified by words such as “plans”, “expects”, “anticipates”, “believes”, “intends”, “estimates”, “potential”, “possible” and similar expressions, or statements that events, conditions or results “will”, “may”, “could” or “should” occur or be achieved. In stating the forward-looking information herein, Lithium Americas has applied certain material assumptions including, but not limited to, the assumption that general business conditions will not change in a materially adverse manner.
Forward-looking information involves information about the future and is inherently uncertain, and actual results, performance or achievements of Lithium Americas and its subsidiaries may differ materially from any future results, performance or achievements expressed or implied by the forward-looking information due to a variety of risks, uncertainties and other factors. Such risks and other factors include, among others, risks associated with construction and changes to project timelines (including risks associated with timing, delays, progress, approach, continuity or change in plans or construction cost estimates); risks associated with raising sufficient financing in a timely manner and on acceptable terms; and risks associated with fluctuations in lithium and other commodity prices and currency exchange rates; and other risks and uncertainties disclosed in information released by Lithium Americas and filed with the applicable regulatory agencies.
Lithium Americas’ forward-looking information is based on the beliefs, expectations and opinions of management on the date such information is posted, and Lithium Americas does not assume, and expressly disclaims, any intention or obligation to update or revise any forward-looking information whether as a result of new information, future events or otherwise, except as otherwise required by applicable securities legislation. For the reasons set forth above, investors should not place undue reliance on forward-looking information.
This news release also contains forward-looking information related to the mineral resource and mineral reserve estimates for the Thacker Pass deposit and the information in this news release should be qualified in its entirety based on the information in the Technical Report. The material factors that could cause actual results to differ from the conclusions, estimates, designs, forecasts or projections include geological modeling, grade interpolations, lithium price estimates, mining cost estimates, mine design parameters, and final pit shell limits such as more detailed exploration drilling or final pit slope angle.
Last Trade: | US$3.87 |
Daily Change: | 0.22 6.03 |
Daily Volume: | 6,125,890 |
Market Cap: | US$845.130M |
November 07, 2024 October 28, 2024 October 16, 2024 August 30, 2024 August 14, 2024 |
UGE International develops, owns, and operates commercial and community solar projects in the United States and strategic markets abroad. Our distributed energy solutions deliver cheaper, cleaner energy to businesses and consumers...
CLICK TO LEARN MOREGreenPower Motor designs, builds and distributes a full suite of high-floor and low-floor all-electric medium and heavy-duty vehicles, including transit buses, school buses, shuttles, cargo van, and a cab and chassis...
CLICK TO LEARN MORECOPYRIGHT ©2022 GREEN STOCK NEWS