Q1 2024 Highlights
TORONTO / Apr 30, 2024 / Business Wire / Largo Inc. ("Largo" or the "Company") (TSX: LGO) (NASDAQ: LGO) today announces the implementation of extensive changes to reduce production costs and improve productivity at its Maracás Menchen Mine through several initiatives, including the reduction of haulage distances, costs of inputs as well as comprehensive review of all contracts. The Company will reduce the number of contractors by 20% in Q2 2024 and prioritize its capital expenditures for low-cost, high-return projects in order to optimize the use of cash. The Company also announces quarterly production of 1,729 tonnes of vanadium pentoxide (“V2O5”) equivalent and sales of 2,765 tonnes V2O5 equivalent in Q1 2024.
As part of the plan to increase productivity, the Company plans to increase its annual crushing capacity by approximately 220,000 tonnes or 22% by the end of Q2 2024 following the installation of a mobile crusher, dry magnetic and wet magnetic separator from inventory, which is expected to compensate for lower grades and higher silica levels resulting from increased processing of disseminated vanadium ore. These actions are expected to maintain the Company’s production capacity by providing the required throughput and grades needed to achieve its set production targets in accordance with its 2024 mining plan.
Also, starting in Q2 2024, the Company plans to feed its ilmenite plant with ilmenite feedstock from its non-magnetic ponds from ores processed in prior years. This action is expected to increase ilmenite production in 2024 as well as improve titanium dioxide (“TiO2”) grades as non-magnetic material stored in the Company’s ponds contain higher TiO2 grades than feedstock from current mine operations.
For the remainder of 2024, the Company expects a reduction of approximately BRL$48 million in operating expenditures and approximately BRL$12 million in ilmenite capital expenditures.
Celio Pereira, COO of Largo, Brazil, stated: "Maximizing operational output and reducing costs remain top priorities at Largo. We have identified several avenues for cost reduction at the Maracás Menchen Mine and we expect to realize the benefits of these initiatives in the second half of the year. When combined with our productivity improvement initiatives this year, these measures are expected to assist the Company in achieving its revised 2024 cost guidance and offset some of the impact of lower vanadium prices." He continued: “In Q1 2024, the operations team conducted the planned annual maintenance at the mine, which included the replacement of the kiln refractory as well annual maintenance actions performed in the crushing, milling, ilmenite, leaching and chemical sections of the plant. Following this maintenance, we also expect to remain within our annual production guidance of 9,000 to 11,000 tonnes of V2O5 for 2024.”
Maracás Menchen Mine Operational and Sales Results
Q1 2024 | Q1 2023 | |
|
|
|
Total Mined – Dry Basis (tonnes) | 3,243,492 | 3,523,656 |
Total Ore Mined (tonnes) | 604,231 | 341,967 |
Ore Grade Mined - Effective Grade (%)2 | 0.53 | 0.81 |
|
|
|
Concentrate Produced (tonnes) | 74,986 | 78,695 |
Grade of Concentrate (%) | 2.90 | 2.99 |
Global Recovery (%)3 | 70.5 | 83.0 |
|
|
|
V2O5 produced (Flake + Powder) (tonnes) | 1,729 | 2,111 |
V2O5 produced (equivalent pounds) 2 | 3,811,788 | 4,653,953 |
Total V2O5 equivalent sold (tonnes) | 2,765 | 2,849 |
Produced V2O5 equivalent sold (tonnes) | 2,609 | 2,604 |
Purchased V2O5 equivalent sold (tonnes) | 156 | 245 |
|
|
|
Ilmenite concentrate produced (tonnes) | 9,563 | Nil |
Ilmenite concentrate sold (tonnes) | 513 | Nil |
Q1 2024 Production and Sales Overview
Revised 2024 Cash Operating Costs Excluding Royalties1
Cash operating costs excluding royalties ($ / lb V2O5 sold)i | Previous Q2 | Previous Q3 | Previous Q4 | Unchanged 2024 | ||||
Low | High | Low | High | Low | High | Low 4.50 | High 5.50 | |
4.15 | 5.15 | 4.75 | 5.75 | 4.75 | 5.75 | |||
Revised Q2 | Revised Q3 | Revised Q4 | ||||||
Low | High | Low | High | Low | High | |||
4.50 | 5.50 | 4.50 | 5.50 | 4.50 | 5.50 | |||
Ilmenite Concentrate Plant Capital Expenditures | Previous 2024 | Revised 2024 | ||||||
| $3.2 – 3.8 million |
|
| $1.0 – 2.0 million |
About Largo
Largo is a globally recognized vanadium company known for its high-quality VPURETM and VPURE+TM products, sourced from its Maracás Menchen Mine in Brazil. The Company is currently focused on implementing an ilmenite concentrate plant and is undertaking a strategic evaluation of its U.S.-based clean energy business, including its advanced VCHARGE vanadium battery technology to maximize the value of the organization. Largo's strategic business plan centers on maintaining its position as a leading vanadium supplier with a growth strategy to support a low-carbon future.
Largo’s common shares trade on the Nasdaq Stock Market and on the Toronto Stock Exchange under the symbol "LGO". For more information on the Company, please visit www.largoinc.com.
Cautionary Statement Regarding Forward-looking Information:
This press release contains "forward-looking information" and "forward-looking statements" (collectively, “forward looking statements”) within the meaning of applicable Canadian and United States securities legislation. Forward‐looking statements in this press release include, but are not limited to: the achievement of operational stability; Largo’s ability to improve cash flow in the future; implemented cost reduction measures; expected sales; diversifying the Company's product offering; optimizing operations, continued advancements at the Maracás Menchen Mine; the conclusion of the installation of Largo’s battery project; and future commitments to purchase V2O5.
The following are some of the assumptions upon which forward-looking statements are based: that general business and economic conditions will not change in a material adverse manner; demand for, and stable or improving price of V2O5 and other vanadium commodities; receipt of regulatory and governmental approvals, permits and renewals in a timely manner; that the Company will not experience any material accident, labour dispute or failure of plant or equipment or other material disruption in the Company's operations at the Maracás Menchen Mine or relating to LCE; the availability of financing for operations and development; the ability to mitigate the impact of continuing heavy rainfall; the Company's ability to procure equipment and operating supplies in sufficient quantities and on a timely basis; that the estimates of the resources and reserves at the Maracás Menchen Mine are within reasonable bounds of accuracy (including with respect to size, grade and recovery and the operational and price assumptions on which such estimates are based); the Company's sales and trading arrangements will not be affected by the evolving sanctions against Russia; and the Company's ability to attract and retain skilled personnel and directors; the ability of management to execute strategic goals.
Forward-looking statements can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". All information contained in this news release, other than statements of current and historical fact, is forward looking information. Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Largo or LCE to be materially different from those expressed or implied by such forward-looking statements, including but not limited to those risks described in the annual information form of Largo and in its public documents filed on www.sedarplus.com and available on www.sec.gov from time to time. Forward-looking statements are based on the opinions and estimates of management as of the date such statements are made. Although management of Largo has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. Largo does not undertake to update any forward-looking statements, except in accordance with applicable securities laws. Readers should also review the risks and uncertainties sections of Largo's most recent annual and interim MD&A, which also apply. Largo's most recent annual and interim MD&A are available on Largo’s SEDAR+ profile at www.sedarplus.com.
Last Trade: | US$1.74 |
Daily Change: | 0.02 1.16 |
Daily Volume: | 59,215 |
Market Cap: | US$111.550M |
December 19, 2024 December 19, 2024 November 26, 2024 November 12, 2024 |
GreenPower Motor designs, builds and distributes a full suite of high-floor and low-floor all-electric medium and heavy-duty vehicles, including transit buses, school buses, shuttles, cargo van, and a cab and chassis...
CLICK TO LEARN MORESurf Air Mobility is a regional air mobility platform expanding the category of regional air travel to reinvent flying through the power of electrification. In an effort to substantially reduce the cost and environmental impact of...
CLICK TO LEARN MORECOPYRIGHT ©2022 GREEN STOCK NEWS